Situated in Point Trotter Industrial Park offering excellent connectivity to major transportation routes, including Glenmore Trail SE, Peigan Trail SE, and Deerfoot Trail.
State-of-the-Art facility equipped with an ESFR sprinkler system, LED lighting throughout, and hydronic heating for the semi-trailer ramp, allowing for snow free conditions all winter long.
Includes spacious shell concrete mezzanine office space and a fully fenced paved yard – this property is designed to meet the specific needs of various businesses.
19 trailer stalls with potential for more, dock and grade level loading, and energized stalls for truck and trailer parking.
Address Full
7290 106 Avenue, SE
Calgary
Alberta
T2C 4Z8
Canada
Additional Details
Site Size: 2.37 Acres
Building Size: 20,904 SF +/-
Warehouse: Size 17,694 SF +/-
Main Floor Office: 1,605 SF +/-
Second Floor Office (Shell) 1,605 SF +/-
Loading: 7 – Dock (8’6” x 10’); 1 – Ramped DI (14’ x 16’)